25 cubic meters/hour KYB Batching Plant with SCADA
Greenfield Project spread in 70,000 Square meter including Plant building, Cooling Tower, LNG Gas Station, 66 KVA &11 KVA Substation, 6000 Square meter open Storage, Admin Block, STP, UG Tank, Compound Wall, Roads and Drain, Truck Parking, Wight Bridge, Security cabin Etc.
For Hindalco (Ryker Base Pvt. Ltd.), we built a copper rolling mill with a plot area of 70,000 square meters. The factory shed being 15,000 square meters has a major equipment foundation & RCC Mezzanine floor. This project also included building a 66KVA Substation, 6000 square meters of open cathode storage, Cooling tower, LNG Gas station, compound wall, Road, drain, track parking, weighbridge, security cabin, fire tank, etc.
25 cubic meters/hour KYB Batching Plant with SCADA
3 Nos. 7 cubic meters Transit Mixture (KYB Conmet & Schwing Stetter)
4 cubic meters Self Loading Mixture Machine (Schwing Stetter)
3 JCB Excavator / Loader
Concrete pump(Schwing Stetter)
Hilti Rotating Laser level Machine
Laser-operated flooring screed