KYB-Conmat Batching Plant (30 m³/hr) - Ensuring consistent and high-quality concrete production.
The Polycab UH-13 Smart Meter facility is a cutting-edge infrastructure featuring a reinforced concrete building with a total built-up area of 3,75,000 sq. ft., comprising Ground Floor (GF), First Floor (FF), and Second Floor (SF). Each slab is constructed with a height of 5.5 meters. The structure is topped with a Prefabricated shed, Constructed to support the operational needs of smart meter manufacturing and logistics.
Construction Timeline
The entire construction activity was meticulously planned and executed within a 9-month schedule, reflecting efficient project management and adherence to quality standards.
To achieve precision, speed, and safety, the following advanced machinery and formwork systems were deployed:
KYB-Conmat Batching Plant (30 m³/hr) - Ensuring consistent and high-quality concrete production.
Schwing Stetter Boom Pump - Facilitating efficient concrete placement across all levels.
HANDSET Alpha Panel Formwork - Providing flexibility and accuracy in wall and column formwork.
PERI UP MI Stair Tower - Enabling safe and reliable vertical access during construction.
PERI VT20 - High-performance timber beams for slab formwork.
SBPL Universal Slab Formwork - Supporting large-scale slab casting with speed and precision.
Total Reinforcement Consumption : 2100 metric tons / Total Concrete Consumption :21500 cubic meters