Production Building Finished on Time During Peak Monsoon

Ansa Deco glass plot area of 8600 square meters and building built-up area of 6000 square meters(G+1 Floor). Despite challenges like existing adjacent building foundations at a 500mm distance, carrying out Earth Work during Monsoon, and soil quality being black cotton soil we executed the project within time. We were appreciated for our timely delivery of the entire civil work including specialized items viz. False Ceiling, Aluminium Work, Structural Steel Work, etc during a crucial monsoon period

Major Machinery used

  • Schwing Stetter Boom Pump

  • 7 cubic meters Transit Mixture

  • 4 cubic meters Self Loading Mixture

  • Machine (Ajex)

  • Mini Crane for Material Lifting

  • Baby Roller

  • Bucket Hydra

  • 2 JCB Excavator / Loader

  • Hilti Rotating Laser Level Machine

Total Reinforcement Consumption : 502 metric tons / Total Concrete Consumption : 6700 cubic meters
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd
ANSA Decoglass Pvt. Ltd